Marine & Fuel Systems1996Tacoma, WA & Dutch Harbor, AK

Custom Vessel Fuel Systems for a Commercial Fishing Fleet

Designed, built, and installed six custom fuel tanks in just 21 days to extend two commercial fishing vessels' range to distant Bering Sea fishing grounds.

21
Days Start to Install
6
Custom Tanks
104K
Gallons Total Capacity

The Challenge

A commercial fishing operator needed to extend the range of two vessels to reach distant Bering Sea fishing grounds — with only three weeks before the season opened. The tanks had to fit inside existing ballast tanks, survive constant salt-water and diesel exposure, and be fabricated from a novel coated fabric never before field-tested in such demanding conditions.

Our Solution

SaintX engineered six custom RF-welded fuel bladders — two 26,000-gallon tanks for one vessel and four 13,000-gallon tanks for the other — each uniquely shaped to its vessel's fill and discharge ports. Using a new salt-water and fuel-compatible coated fabric, the team designed, built, and installed all six tanks within the 21-day window and coordinated approval with the U.S. Coast Guard, then supported Dutch Harbor operations.

Results & Outcomes

  • All six custom tanks designed, built, and installed in 21 days
  • Extended vessel range to reach Bering Sea fishing grounds
  • Increased fuel capacity and catch potential per voyage
  • Coordinated U.S. Coast Guard approval and Dutch Harbor support

Project Details

Client
Commercial Fishing Fleet Operator
Timeframe
1996
Location
Tacoma, WA & Dutch Harbor, AK
Capabilities
MarineFuel BladdersRapid Turnaround

Similar Requirement?

Let's discuss how we can support your mission with the same precision and reliability.

Get in Touch

Shop Documentation

Built and Proofed Before It Ships

Custom vessel tanks photographed on the Saint production floor during fill, pressure test, and final fitting checks — the build and proof sequence every marine tank goes through before installation.

04 Images — Click to Enlarge

/A finished tank filled to capacity indoors for pressure and leak test. No unit leaves the floor until it has held its full load under supervision.
/Side elevation under full fill. Suspended on slings so every RF-welded seam, baffle line, and fitting can be walked and inspected end to end.
/Crew running a fill on a long-format tank. Each unit is shaped to the compartment it will occupy, with fill and discharge ports set to the vessel's existing plumbing.
/Laid out flat for final port and fitting checks — fuel alongside potable water. Same construction, different service, marked so crews cannot cross them.